The function of this ultraviolet disinfection unit is to provide in excess of 99% reduction of all water 
borne pathogenic (disease causing) bacteria.

Model Triton series have a number code designation correspondent to the maximum gpm 

 

(gallons per minute) flow rate of the unit.  I.E.- TRI-8 has a maximum flow capacity of 8 gpm.

Applications:

Ultraviolet Germicidal Disinfection

Neptune Ultraviolet Disinfection Units are designed to destroy micro-organisms in water supplies.  The 
Ultraviolet lamp peak radiation of 254 nanometer wavelength (nm) destroys or inactivates the D.N.A. 
(deoxyribonucleic acid) which absorbs the Ultraviolet radiation.  Triton Germicidal 
Disinfection units meet minimum dosages of 30,000 microwatt second per square centimeter.

MAXIMUM CONCENTRATION LEVELS BEFORE ULTRAVIOLET:

Turbidity.................................5 NTU 

         Hardness..........................................7 gpg 

Color.......................................None 

         Iron...................................................0.3 ppm

Manganese........................0.05 ppm 

         pH....................................................6.5 - 9.5ppm

Important Note - Pre-filtration equipment may be required if these parameters cannot be maintained.  
Flow rate must not exceed rated capacity of the unit.

DESCRIPTION OF EQUIPMENT:

The Triton series has an unique design with an ultraviolet germicidal lamp housed within a 

 

single quartz sleeve surrounded by a stainless steel pressure chamber.  The chamber is fabricated out  
of 304 Stainless Steel.  

These units come with an ultraviolet lamp designed with four pins at one end.

The quartz sleeve is intended to be placed through the disinfection chamber and will slightly protrude 
through the threaded nipple.  The ultraviolet lamp is placed within this quartz sleeve.  The U.V. light 
shines through this specially designed hard quartz sleeve for maximum disinfection efficiency to meet 
the requirements for bacteria reduction in potable water.

The inlet/outlet are located on one side of the chamber and may be interchanged as to designation  
dependent upon installation.  A Site Port is provided for safe and easy view of operation.  A box is 
secured to the wall and the chamber is held in place by tightening the lock nut to both mounting  
box and chamber.

Summary of Contents for Neptune TRI Series

Page 1: ...on Systems Model TRI 8 TRI 12 TRI 20 It is important that those responsible for the installation of this equipment as well as the owner operator read this manual and carefully follow the instructions...

Page 2: ...nded or sold by the manufacturer distributor may cause an unsafe condition 7 Intended for indoor use Do not install this disinfection system where it will be exposed to the weather Do not store this d...

Page 3: ...on equipment may be required if these parameters cannot be maintained Flow rate must not exceed rated capacity of the unit DESCRIPTION OF EQUIPMENT The Triton series has an unique design with an ultra...

Page 4: ...always be properly grounded INSTALLATION The Triton series are always placed after the pressure tank and any other type of treatment devices i e softeners filters These units are normally installed in...

Page 5: ...selected Simply hand press or slightly tap in the flow control until it sits on the inside ledge of the machined port 3 Using the mounting box provided secure unit to wall or other surface Make sure t...

Page 6: ...6...

Page 7: ...is operational 4 Set the 1 Year Lamp Timer WITH NEW UV LAMP Make sure the control box is plugged into the wall outlet and the UV lamp is on Press and hold the reset button Hold the reset button down f...

Page 8: ...8...

Page 9: ...the quartz sleeve After sufficient film has formed on the quartz sleeve the ability of the ultraviolet germicidal rays to pass though the quartz sleeve and into the water may be impaired Therefore it...

Page 10: ...V to effectively kill bacteria Failure to replace the U V lamps every 9 000 hours may cause bacteriological breakthrough Should the use of the disinfection unit be intermittent in no case should the...

Page 11: ...to determine how much chlorine solution should be used In some instances removing the seal to measure the water can be a difficult task and it is easier to guess at the quantity of disinfectant needed...

Page 12: ...w to protect wells and springs and keep them from becoming contaminated call or visit your local Cooperative Extension office or your nearest certified water treatment specialist TABLE 1 Quantity of s...

Page 13: ...Water System Using Well Sanitizer Pellets Table 1 Well Diameter Inches Weight of Pellets lbs oz Cups of Pellets Number of Pellets To produce a 400 P P M chlorine dosage NOTE Pellets Weight 1 14 gram e...

Page 14: ...n water back down the well this also rinses upper portion of well After about 15 minutes of recirculation the water a strong chlorine odor should be apparent Turn off hose 6 Bypass water softener and...

Page 15: ...gulator or above 120 volts Line cord disconnected Check replace or outlet defective Defective U V lamp Replace Defective lamp ballast Check output voltage Replace ballast Loose open circuit wire Trace...

Page 16: ...ibutor freight paid It is the dealer customer responsibility to reinstall any components which require replacement under warranty No labor will be covered under this Limited Warranty Neptune U V Disin...

Page 17: ...pe Size Overall Dimensions Shipping GPM 120V 120V L x W x D Weight TRI 8 8 1 0 03 0 25 3 4 MIP 21 x 3 5 x 3 5 9 Lbs TRI 12 12 1 0 03 0 25 3 4 MIP 32 x 3 5 x 3 5 18 Lbs TRI 20 20 1 0 03 0 25 1 MIP 35 x...

Page 18: ...bottle or sterile container being used Holding the cap in a down position the operator should then hold his breath while taking the sample so as to avoid oral contamination of the sample The operator...

Page 19: ...19 WIRING DIAGRAM...

Page 20: ...20 7 7 5 1 2 5 5 1 67 03 21752 2 5 5 5 2 0 3 8 0 287 7...

Page 21: ...21 DRAWING AND PART NUMBERS...

Page 22: ...ort Nut 1 7 WTA 268 Top Mounting Bracket 1 8 WTA5 410 Lock Nut 1 9 WTA8 544 End Nut O Ring seal quartz sleeve 1 10 WTA5 409 Brass End Nut 1 11 WTA8 546 O Ring for shroud on end nut 1 12 WTA 7091 Gayno...

Page 23: ...Port Nut 1 7 WTA 268 Top Mounting Bracket 1 8 WTA5 410 Lock Nut 1 9 WTA8 544 End Nut O Ring seal quartz sleeve 1 10 WTA5 409 Brass End Nut 1 11 WTA8 546 O Ring for shroud on end nut 1 12 WTA 7091 Gayn...

Page 24: ...TA5 410 Lock Nut 1 7 WTA8 544 End Nut O Ring seal quartz sleeve 1 8 WTA5 409 Brass End Nut 1 9 WTA8 546 O Ring for shroud on end nut 1 10 WTA 7091 Gaynor Connector 1 11 HS4 075 BK Shrink Tubing 167 12...

Page 25: ...0 12 3 57 180 5 6 5 37 21 47 76 2 76 RQWURO RDUG R URQW 76 76 RQWURO RDUG 76 RUNKRUVH DOODVW 76 0 1 ORQ 6WDQGRII 76 2 76 RQWURO RDUG R DFN 2XWOHW 76 0 RYHU 6FUHZV 76 6WUDLQ 5HOLHI 76 OHFWULFDO 3OXJ 7...

Page 26: ...26 NOTES...

Page 27: ...27 NOTES...

Page 28: ......

Reviews: