16
NOTE:
At this stage no water can flow through
the unit.
IMPORTANT:
A suitable sealant should always
be used to seal around the incoming pipework to
prevent water entering the wall.
• Route the cable into the shower unit for
connection to the terminal block
(fig.11)
as follows:
Live
cable to terminal marked
L
Earth
cable to terminal marked
Neutral
cable to terminal marked
N
• Fig.12
shows a schematic wiring diagram.
IMPORTANT:
When connecting the cable fully
tighten the terminal block screws and make sure
that no cable insulation is trapped under the
screws. Loose connections can result in cable
overheating.
NOTE:
The supply cable earth conductor must
be sleeved. The outer sheath of the supply cable
must be stripped back to the minimum.
• The use of connections within the unit or
other points in the shower circuit to supply
power to other equipment i.e. extractor fans,
pumps, etc. will invalidate the guarantee.
•
DO NOT
switch on the electricity supply
until the shower cover has been fitted.
FIT TO THE WALL & CONNECT THE SHOWER SUPPLIES
7
check list
SECTION
Fig.11
1. Terminal block
2. Solenoid valve
3. Thermal cut-out (main)
4. Start/Stop button
5. Motor Power Supply
L
N
E
L
+
-
N
M
1
4
5
6
8
7
7
3
inlet
outlet
2
9
6. Pump and motor assembly
7. Selector microswitches
8. LED indicator
9. Heater Can Elements
Fig.12
Summary of Contents for T90SR
Page 27: ...27 SPARE PARTS 10 7 6 5 4 1 3 8 2 13 11 9 16 1 9 12 6 8 2 4 7 13 3 10 5 14 14 15 17 11 12 ...
Page 30: ...30 ...
Page 31: ...31 ...