20
COMMISSIONING
9
check list
SECTION
SWITCH OFF THE ELECTRICITY SUPPLY TO THE
SHOWER AT THE ISOLATING SWITCH BEFORE
PROCEEDING TO STAGE 5.
5.
Unscrew the cover retaining screws and lift the
cover from the backplate.
6.
Make sure the commission link is moved to the
OFF
position - see
fig.14
.
NOTE: With the commission link in the
OFF
position the pump is
ON
and will operate
normally.
7.
Remove the locking screw from the power
selector spindle
(fig.18)
and store for future
use. Make sure the selector spindle is left at the
same position.
8.
Check to ensure that the wiring is not trapped
and replace the cover squarely to the backplate
and guide into position so that the knobs
locate correctly into the splined spindles.
Should any difficulty arise, recheck the
points above.
9.
While applying slight pressure to the cover,
secure in position with the retaining screws.
Fit the showerhead to the flexible hose and
place in the showerhead holder.
The shower is now ready for normal operation.
Fig.18
R
emove locking screw
after commissioning
has been successfully
completed
power
selector
spindle
Spindle
marker
set on
COLD
Summary of Contents for T90SR
Page 27: ...27 SPARE PARTS 10 7 6 5 4 1 3 8 2 13 11 9 16 1 9 12 6 8 2 4 7 13 3 10 5 14 14 15 17 11 12 ...
Page 30: ...30 ...
Page 31: ...31 ...