1575-17
STEP 08
• Rotate Upper Cable (70) as shown.
• Install Pulley no. 1, 2, 4, 6 to unit using 4-3/8”x2-1/2” Hex Bolts (77) 8-Middle Bushings (67) 8-3/8” Washers (86) 4-3/8”
Lock Nuts (83).
• Install Pulley no 7, 8 to unit using 2-3/8”x2” Hex Bolts (80) 4-3/8” Washers (86) and 2-3/8” Locknuts (83)
• Attach Hand Grips (54) to Lat Bar (18).
• Attach Lat Bar (18) to Ball End of Upper Cable (70) using 2-Chain Hooks (45) 1-Chain (37).
ASSEMBLY STEP
STEP8
86
67
67
86
83
46
8
18
46
67
83
86
70
46
86
3
86
83
77
80
70
86
83
86
30
80
46
30
67
77
7
86
70
7
34
33
2
3
4
5
6
54
46
14
7
15
77
86
67
67
86
83
45
37
45
1
2
4
6
7
8
4
6
Summary of Contents for iSMART 600
Page 28: ...1575 28 11 EXPLODED DRAWING...
Page 32: ...1575 32...