9
ASSEMBLY STEPS
1. PREPARATION
•
Before assembling make sure that you will have enough space around the item.
•
Use the supplied parts and hardware for the assembly.
•
Before assembling, please check whether all the required parts have been supplied as per the exploded
drawing on the opposite page.
STEP 1:
Remove the Shipping Tubes (89) from the Main Frame (1) by removing 4 Screws (M10 x 15 x S6) (88) and
4 Washers (
Ø
20 x
Ø
10.5 x 2.0) (53) with Allen Wrench (S6) (36).
NOTE:
You can keep these parts for future packaging and transportation of the bike if desired.
STEP 1
#20M03T011 SPIN1200 USER MANUAL.indd 9
2020/03/25 2:55 PM