background image

Model:  02A7874C0110 

20 Ton Two Stage Jack 

 

10/2012 | Rev. 02 

Page | 7 

 
9.2 

MAINTENANCE SCHEDULE 

(continued) 

9.2.1 

Storage/Low Usage 

If jack is unused for 90 days, raise ram to full hydraulic extension, spray ram with DoALL RPM, LPS or equivalent water 
repellant, BUNA N compatible lubricant. 
 
9.3 

REMOVING AND SERVICING PUMP 

NOTE:  If pump is found faulty, call the factory for replacement or replace seals as follows: 

1.  Review Appendix III HC-1961 Hand Pump Parts List. 
2.  Clamp suction (push on) hose and remove hose from pump. 
3.  Uncouple fittings of hydraulic hoses from pump. 
4.  Remove pump from jack. 
5.  Remove cotter pin from clevis pin. 
6.  Remove four (4) socket head cap screws. 
7.  Remove flanges. 
8.  Remove tube assembly. 
9.  Replace O-rings and backup ring. (See Appendix III for kits available.) 
10.  Re-assemble in reverse order. 
 
9.4 

JACK FUNCTION LOAD TEST 

NOTE:  If function load testing is required: 

1.  Take all necessary precautions to prevent injury. 
2.  Always jack against a load and 

never

 against the jack itself. 

3.  Do not exceed a test load equal to the jack rated capacity plus 10%. 
 
9.5 

PNEUMATIC PUMP 

See Appendix II Haskel Air Pump Manufacturer Data for complete parts list and repair information. 
 

10.0 

TROUBLE SHOOTING 

TROUBLE 

PROBABLE CAUSE 

ACTION 

Fluid leakage at pump piston or 
pump body 

Damaged backup ring, o-ring, piston or pump 
body 

Remove piston and pump body. Inspect 
for damage. Replace defective part(s). 
Replace removed o-ring and backup ring 

External fluid leakage at rams 

Damaged o-ring, backup ring or inner cylinder 
wall 

Remove rams as a unit from cylinder. 
Inspect parts. Replace o-ring and 
defective part(s) 

Jack fails to lift rated load 

Release valve not closed properly 

Fully tighten release valve 

Low fluid level 

Fill to correct fluid level 

Pressure relief valve improperly adjusted 

Adjust or replace release valve 

Leakage at inlet or outlet check ball 

Inspect valve body for wear or replace 
valve body and check balls 

Vent screw closed 

Open vent screw 

Rams will not support load after 
manual or pneumatic pump up 

Leaking ram o-ring seals 

Check for external leakage, if present 
replace defective seal and back up ring 

Leaking pressure check valve 

Inspect valve body for wear or replace 
valve body and check balls 

Leaking pressure relief valve 

Remove release valve, inspect ball and 
ball seat in pump block. Replace effective 
part(s) 

Rams raise and fall with each 
manual pump stroke 

Release valve open 

Fully tighten release valve 

Inlet check valve not seated or sticking 

Pump rapidly to dislodge or replace valve 
body 

Pressure check valve not seated or sticking 

Pump rapidly to dislodge or replace valve 
body 

Jack fails to lower 

Ram locknut not loosened 

Raise jack ¼ inch and release locknut 

Vent screw closed 

Open vent screw 

O-Ring (pinched or rolled) 

Replace o-ring and back-up ring, clean up 
cylinder wall of debris 

 

Summary of Contents for 02A7874C0110

Page 1: ...ATION SERVICE MANUAL Tronair Inc Phone 419 866 6301 800 426 6301 1 Air Cargo Pkwy East Web www tronair com Swanton OH 43558 Email sales tronair com Model 02A7874C0110 20 Ton Two Stage Jack 10 2012 Rev...

Page 2: ...REVISION DATE TEXT AFFECTED 01 10 2010 Original Release 02 10 2012 Modified Parts List...

Page 3: ...3 4 PACKAGING PROTECTION 2 3 5 LABELING OF PACKAGING 2 3 6 STORAGE COMPATIBILITY 2 3 7 STORAGE ENVIRONMENT 3 3 8 STORAGE SPACE AND HANDLING FACILITIES 3 4 0 TRANSPORTATION 3 5 0 ASSEMBLY 3 5 1 GENERAL...

Page 4: ...ist and Illustrations 2 0 SAFETY INFORMATION 2 1 ALARM AND WARNING SYSTEMS None 2 2 WARNING AND DANGER SIGNS See labels on unit WARNING The ram locknuts are user operated safety devices Failure to uti...

Page 5: ...craft technician The operator must be familiar with the jacking procedures for the aircraft to be raised and the operation of the jack Installation Maintenance Dismantling Qualifications This jack is...

Page 6: ...ndustry standards for Grade 5 bolts All replacement parts must be the same as or better than the original parts supplied Dispose of waste per federal and local laws and regulations No modifications ar...

Page 7: ...lating forces Operate between 20 C and 50 C 4 F and 122 F Hydraulic pump operates with 90 100 psi 6 21 6 89 bar air pressure 7 2 NUMERICAL VALUES Rated Capacity 40 000 lbs 18 144 kg Minimum Closed Hei...

Page 8: ...ccordance with the Operator and or Technical Manuals 2 It is not allowed to work under the raised load until it is secured by suitable means i e Ram Locknut 3 The employer of the operator shall provid...

Page 9: ...on ram Always wear safety glasses 8 0 TRAINING Training of operating personnel is the responsibility of the employer This jack must be used in accordance with aircraft manufacturer s instructions 9 0...

Page 10: ...r pump body Remove piston and pump body Inspect for damage Replace defective part s Replace removed o ring and backup ring External fluid leakage at rams Damaged o ring backup ring or inner cylinder w...

Page 11: ...ial Authorization RMA number will be issued for reference purposes on any shipping documents Failure to obtain a RMA in advance of returning an item will result in a service fee A decision on the exte...

Page 12: ...ption Qty 1 K 3333 Assembly Blowgun 1 2 H 1009 01 Assembly Handle 1 3 Z 6154 Air Pump 1 4 HC 2338 Gauge Level 1 5 H 2888 Stop Nut 1 6 H 2887 Stop Nut 1 7 HJ 557 Pad Jack 1 8 Z 6449 Assembly Cylinder 1...

Page 13: ...ump Mounting 1 4 TF 1047 04 24 0 Hose 3 8 Push On 24 Long 1 5 N 2410 05 Elbow 90 Male 3 8 NPT 3 8 Barbed Fitting 1 6 G 1100 106512 Bolt HH GR 5 5 16 24 x 1 Long 2 7 TF 1043 20 13 0 Assembly Hose 13 Lo...

Page 14: ...81 Ram Second Stage 1 3 TR 1970 01 Cylinder Machined 1 4 R 2284 01 Cap Top 1 5 R 2285 01 Cap Bottom 1 6 TR 1973 Guide 1 st Stage Ram 1 7 TR 1974 Bushing 1 st Stage Ram 1 8 TR 1975 Bushing 2 nd Stage R...

Page 15: ...External Retaining 1 18 HC 2000 366 O Ring Bottom Cap Series 2 1 19 G 1151 103203 Screw 10 24 x SHCS 1 20 HC 2023 365 Backup Bottom Cap O Ring 1 21 G 1397 293 Ring External Locknut Retaining 1 K 4310...

Page 16: ......

Page 17: ...APPENDIX I Hydraulic Schematic...

Page 18: ......

Page 19: ...Hydraulic Schematic...

Page 20: ......

Page 21: ...APPENDIX II Haskel Air Pump Manufacturer Data...

Page 22: ......

Page 23: ......

Page 24: ......

Page 25: ......

Page 26: ......

Page 27: ......

Page 28: ......

Page 29: ......

Page 30: ......

Page 31: ......

Page 32: ......

Page 33: ......

Page 34: ......

Page 35: ......

Page 36: ......

Page 37: ......

Page 38: ......

Page 39: ......

Page 40: ......

Page 41: ......

Page 42: ......

Page 43: ......

Page 44: ......

Page 45: ......

Page 46: ......

Page 47: ......

Page 48: ......

Page 49: ...APPENDIX III HC 1961 Hand Pump Parts List...

Page 50: ......

Page 51: ...onair Inc Phone 419 866 6301 800 426 6301 1 Air Cargo Pkwy East Web www tronair com Swanton OH 43558 Email sales tronair com Model HC 1961 3250 psi Hand Pump Parts List With Illustrations 05 2005 Rev...

Page 52: ......

Page 53: ...f your Unit Reference Illustrations on following page Item Part Number Description Qty 4 518 000 Screw Socket Head Cap 4 9 Not Sold Separately Pump Body 1 10 H 2606 Assembly Relief Screw 1 24 506 000...

Page 54: ...ent consists of 2 Wiper Rod 1 3 Ring Backup 1 5 O ring Piston 1 6 O ring Valve Body 1 8 O ring Tube Seal 1 11 O ring Relief Screw 1 16 O ring Release Screw 1 27 O ring Outlet Check 1 34 Ring Backup Re...

Page 55: ...APPENDIX IV Declaration of Conformity...

Page 56: ......

Page 57: ...Y The design development and manufacture is in accordance with European Community guidelines Tripod Jack 02A7874C0110 Relevant provisions complied with by the machinery 2006 42 EC Relevant standards c...

Page 58: ......

Page 59: ...APPENDIX I Safety Data Sheet MIL PRF 5606 Hydraulic Fluid...

Page 60: ......

Page 61: ......

Page 62: ......

Page 63: ......

Page 64: ......

Page 65: ......

Page 66: ......

Page 67: ......

Page 68: ......

Page 69: ......

Page 70: ......

Page 71: ......

Page 72: ......

Page 73: ...APPENDIX VI Maintenance Schedule...

Page 74: ......

Page 75: ......

Reviews: