3.3.1 click the icon of loading and unloading consumables to indicate preheating.Remove the consumables to warm up
before pulling them out.Click the number box to heat, the temperature is reached, and click the icon to return
the material.When installing the consumables, the front end of the consumables shall be stroked straight into the hole of
the feeder, and then protruded.As shown in the figure, pass the consumables through the feeder hole, reach the
consumables, and insert the consumables into the bottom of the extrusion head.Click the icon to send the material
to the nozzle.Click the icon to stop feeding.Also insert another filaments and material pipes.
3.3.2Enter the manual menu and switch to E1. Set the moving length to 10mm.Click return 40mm, click E1 to switch
to E2, and click feed.Feed to nozzle E2 color discharge.When setting the slice software, switch the double sprinkler
head back to 40mm.
The cutaway view of extruder head chamber
Summary of Contents for X5S 2E
Page 16: ...Wiring diagram of main board ...