49 / 53
8018_SP1500
V2.2_EN (03/2018)
10.2 Acceptance report
Dear customer!
Please check applicable items:
We request your confirmation of
properly completed transfer of
the machine
Machine parts checked for shipping damage
Machine parts checked against delivery note
Setup of the machine discussed
Startup of the machine discussed
Operation of the machine discussed
Maintenance of the machine discussed
Electrical voltage checked
Safety Instructions discussed
Trial run performed
Deficiencies determined
The machine with the
Please transmit a copy of this
document
– filled out and
signed by an authorized
company representative
– to an
employee of our sales affiliate
for forwarding to the
manufacturer.
Thank you very much.
machine designation: SP1500
has been checked according to the listed items and has
been transferred properly.
City, Date
Company stamp / Signature
Summary of Contents for SP1500
Page 1: ...SP1500 Operation Manual...