Half-timbered construction, "flange to flange"
Fig. 57: Mortar-based installation into a lightweight partition wall with half-timbered construction, flange to flange,
illustration shows side by side installation (applies also to installation of dampers on top of each other)
1
FKR-EU
2.1
Mortar
3.5
Half-timbered construction, cladding on both
sides
4.1
Solid ceiling slab / solid floor
6.8
Infill (cavities completely filled with mineral wool
≥
1000 °C,
≥
50 kg/m³, or bricks, aerated con-
crete, lightweight concrete, reinforced concrete
or clay)
7.9
Timber structure
7.11
Trim panels, double layer with staggered joints,
fire-resistant
7.13
Cladding
7.14
Reinforcing board of the same material as the
wall
9.2
Extension piece or duct
Z
Spigot construction 370 mm
Flange construction 342 mm
s2
Spigot construction 40 – 225 mm
Flange construction 80 – 225 mm
*
Installation near the floor analogous to
Up to EI 90 S
EI 30 S
EI 30 to EI 90 S
Installation
Lightweight partition walls with timber support ... > Mortar-based installation
Fire damper FKR-EU
78
Summary of Contents for FKR-EU
Page 162: ...Fire damper FKR EU 162 ...
Page 163: ...Fire damper FKR EU 163 ...
Page 164: ...Fire damper FKR EU 164 ...