5.8.4 Dry mortarless installation with fire batt
Fig. 72: Dry mortarless installation into a timber wall or CLT wall, with a fire batt
1
FKR-EU
2.4
Coated board system
3.11
Solid wood wall / CLT wall
4.1
Solid ceiling slab / solid floor
7.10
Trim panels (fire-resistant)
7.13a
Cladding, single-layer, fire-resistant
7.14
Reinforcing board of the same material as the
wall
Z
Spigot construction 370 mm
Flange construction 342 mm
*
Installation near the floor analogous to
#
optional
–
Up to EI 60 S
Installation
Solid wood walls > Dry mortarless installation with fire batt
Fire damper FKR-EU
96
Summary of Contents for FKR-EU
Page 162: ...Fire damper FKR EU 162 ...
Page 163: ...Fire damper FKR EU 163 ...
Page 164: ...Fire damper FKR EU 164 ...