background image

Drywall installers have the technical training, knowl-
edge and actual experience to enable them to
understand any potential hazards related to the
work under consideration, and recognise and avoid
any risks involved.

HVAC technician

HVAC technicians are individuals who have suffi-
cient professional or technical training in the field
they are working in to enable them to carry out their
assigned duties at the level of responsibility allo-
cated to them and in compliance with the relevant
guidelines, safety regulations and instructions.
HVAC technicians are individuals who have in-
depth knowledge and skills related to HVAC sys-
tems; they are also responsible for the professional
completion of the work under consideration.

HVAC technicians are individuals who have suffi-
cient professional or technical training, knowledge
and actual experience to enable them to work on
HVAC systems, understand any potential hazards
related to the work under consideration, and recog-
nise and avoid any risks involved.

Personal protective equipment

Personal protective equipment is equipment that
protects the user against health or safety risks at
work.

Personal protective equipment must be worn for
various types of work; the protective equipment
required is listed in this manual together with the
description of each type of work.

Description of personal protective equipment

Industrial safety helmet

Industrial safety helmets protect the head from
falling objects, suspended loads, and the effects of
striking the head against stationary objects.

Protective gloves

Protective gloves protect hands from friction, abra-
sions, punctures, deep cuts, and direct contact with
hot surfaces.

Safety shoes

Safety shoes protect the feet against crushing,
falling parts, and from slipping on slippery ground.

Repair and replacement parts

Only qualified personnel must repair the products,
and they have to use genuine replacement parts.

Transport, storage and packaging

Delivery check

Check delivered items immediately after arrival for
transport damage and completeness. In case of any
damage or an incomplete shipment, contact the
shipping company and your supplier immediately.

Transport, storage and packaging

Chilled ceiling WK-D-WF

2

Summary of Contents for WK-D-WF

Page 1: ...panels can lead to dangerous situations Do not use cooling panels in areas with potentially explosive atmos pheres outdoors in humid rooms in rooms with aggressive or dust laden air at temperatures b...

Page 2: ...d Personal protective equipment Personal protective equipment is equipment that protects the user against health or safety risks at work Personal protective equipment must be worn for various types of...

Page 3: ...e note Store the product only in its original packaging Protect the product from the effects of weather Protect the product from humidity dust and contamination Storage temperature 10 C to 40 C Relati...

Page 4: ...intended load Use preferably threaded rods or suitable rail systems for suspension Use all the provided suspension points Stand clear of suspended loads unless prop erly secured Check secure fixing af...

Page 5: ...iling installation in continuous ceilings is possible with or without adjacent gaps The cooling capacity that can be achieved depends on the structure of the ceiling Installation with gaps allows for...

Page 6: ...DANGER Risk of scalding Working on the hot water system carries a risk of scalding Only specialist personnel should work on the water side connections Before working on the water side connec tions shu...

Page 7: ...lation and then at regular intervals NOTICE Risk of damage to the copper serpentine due to freezing water If the chilled ceiling is not used after the system has been filled subzero temperatures may l...

Page 8: ...on Note Fix the product only to load bearing structural elements Load suspension systems only with the weight of the product Adjacent components and con necting ducts must be supported separately Use...

Page 9: ...24 5 1500 9 5 14 18 5 23 28 33 2000 11 5 17 23 28 5 34 5 40 2500 14 5 22 29 36 5 43 5 51 3000 17 25 33 5 42 50 58 5 3500 19 28 5 38 47 5 57 66 5 4000 21 32 42 5 53 63 5 74 j No of blades k L BN mm Wei...

Page 10: ...nsure that the panels have been correctly fixed and connected to air terminal devices if any Ensure that the water system has been filled and vented Carry out a leakage test with air or water and acco...

Reviews: