9
Index
A
Accident..................................................................... 11
Adjusting multileaf dampers...................................... 58
AHU casing units
Applying sealing tape........................................... 29
Assembling AHU casing units for outdoor
installation............................................................ 29
Assembling the roof segments............................. 29
Cover strips for the intermediate frame, fixing..... 31
Fitting base frame plugs....................................... 30
Fixing.................................................................... 26
Installing ducts..................................................... 31
Installing the noise insulating connector.............. 28
Joining with screws/bolts...................................... 26
Screw-fixing stacked units.................................... 26
Seals, checking.................................................... 24
Setup.................................................................... 24
Stacked installation.............................................. 26
Air handling unit
Commissioning..................................................... 52
Electrical connection............................................ 43
Installing accessories........................................... 32
Aligning droplet eliminator......................................... 61
Applying sealing tape................................................ 29
Assembling the roof segments.......................... 29 , 30
Assembly
Accessories.......................................................... 32
AHU casing units for outdoor installation............. 29
Assembling AHU casing units.............................. 26
Base frame plugs................................................. 30
Ducts.................................................................... 31
Installing AHU casing units on top of each other. 26
Intermediate frame, fixing the cover strips........... 31
Noise insulating connector................................... 28
Roof segments..................................................... 29
Weather hood....................................................... 30
Attaching the weather hood...................................... 30
C
Commissioning the centrifugal fan............................ 54
Commissioning the humidifier................................... 61
Condensate drain...................................................... 36
Cooling coil
Commissioning..................................................... 56
Installing............................................................... 36
Copyright..................................................................... 3
D
Defects liability............................................................ 3
Delivery of the air handling unit................................. 12
Disposing of packaging............................................. 19
Drain trap, connecting............................................... 36
E
Electric air heater
Commissioning..................................................... 57
Electrical connection................................................. 43
Electric current.......................................................... 10
Environmental protection
Chemicals............................................................ 65
Electrical and electronic components................... 64
F
Fan............................................................................ 10
Filters, inserting......................................................... 55
Fire............................................................................ 11
First aid...................................................................... 11
Fitting base frame plugs............................................ 30
H
Hazardous area......................................................... 11
Heating coil
Commissioning..................................................... 56
Installing............................................................... 36
Height of drain trap.................................................... 34
Hotline......................................................................... 3
hydraulic unit............................................................. 39
I
Improper transport equipment................................... 13
Initial commissioning................................................. 52
Centrifugal fan...................................................... 54
Electric air heater................................................. 57
Filters................................................................... 55
Heating coil/cooling coil........................................ 56
Humidifier............................................................. 61
Multileaf dampers................................................. 58
Plate heat exchanger........................................... 60
Rotary heat exchanger......................................... 59
Run around coil system........................................ 57
Sound attenuator.................................................. 59
Starting................................................................. 62
Installation
Condensate drain................................................. 36
Connecting the heating coil/cooling coil............... 36
Connection to the central BMS............................ 44
Connect the steam heat exchanger..................... 38
Drain trap, connecting.......................................... 36
Height of drain trap............................................... 34
Network connection.............................................. 44
Run around coil system........................................ 39
Index
Air handling unit X-CUBE X2 / X-CUBE X2 compact
67