PART NO. 769-06023 P00
(3/10)
Bump
Knob
Inner
Reel
Spool
Spring
3"-4"
IMPORTANT: READ OPERATOR’S MANUAL THOROUGHLY AND FOLLOW THE SAFE OPERATION PRACTICES BEFORE OPERATING THE UNIT.
Removing Unit From Carton
Assemble The Unit
Starting The Unit
Slide shield’s
slot
onto
mounting bracket.
Rotate
shield onto shaft. Push
square bolt
through shield
and bracket. Tighten
washer and wing nut
onto bolt.
Remove cap from lower
boom. Push cutting
attachment into coupler.
Turn coupler knob clockwise
to tighten.
Assemble The Unit
Mix thoroughly in separate
fuel can:
– 3.2 fl. oz. of 2-cycle
engine oil
– 1 gallon of unleaded
gasoline
NOTE:
Do not mix directly in
fuel tank.
Place unit on a level surface.
Fill fuel tank.
Press
primer bulb
10 times
,
or until fuel is visible
Crouch in starting position.
SQUEEZE
and
HOLD
throttle for
ALL
further
steps.
Pull
rope
5 times
.
Move
choke lever to
Position 2
and squeeze
throttle.
Pull
rope
3-5 times
to start
engine.
Run
unit for
30-60
seconds
to warm up.
Continue to squeeze
throttle.
Move
choke lever
to
Position 3
.
1
1
2
Remove all contents from
carton.
5
6
7
1
9
10
3
Put D-handle on shaft. Move
handle a minimum
6 inches
away from shaft grip. Insert
clamp bolt and tighten the
wing nut.
Move
choke lever to
Position 1
.
Continue to squeeze
throttle.
Run
unit for an
additional 60 seconds
to
complete warm-up. Unit
may be used during this
time.
8
4
Unleaded Gasoline
Starting The Unit
11
12
13
14
15
Primer
Bulb
10 X
5 X
3-5 X
Choke Lever
Starter Rope
Fuel Cap
Throttle Control
On/ Off Switch
D-Handle
Ez-Link™
Cutting Head Shield
Need Help?
Call 1-800-828-5500
Electric Starter or
Power Start Bit Optional!
THESE OPTIONAL ACCESSORIES
ARE SOLD SEPARATELY!
This unit has an alternate starting method
that many find easier to use than pulling a
rope. Please contact a local retailer or call
1-800-828-5500
for more information.
Information may also be found at
www.troybilt.com
DIDN’T START?
Repeat these instructions.
IF
engine fails to start after 2 attempts,
move choke lever to position 3 and pull
the starter rope until engine starts
IF
unit still fails to start, refer to the
operator’s manual for additional starting
and troubleshooting information
1 Gallon
3.2 oz
40:1
Choke Lever
Choke Lever
Unscrew bump knob
counterclockwise. Remove
inner reel and spring.
Insert 10'
of
0.095"
SplitLine
®
through hole in top
of reel. Pull most of line
through hole until 3"-4"
remains.
Bend short end and push it
into the other hole. Pull tight.
Wind line tightly in direction
of arrow. Split other end of
SplitLine
®
back 6"-7".
Push 6"-7" ends into 0.095"
holding slots.
Insert or slide lines into the
eyelets in spool. Insert spring
and reel into spool.
1
1
2
Pull lines firmly to release
from holding slots.
Reloading The Line*
3
4
5
6
7
Hold the inner reel in place.
Tighten Bump Knob
clockwise.
1
8
Reloading The Line
Replacement SplitLine
®
:
Part #49U0134K953
For single line installation
, refer to Line Installation
section of this manual.
For replacement spool installation
, refer to
Installing a Prewound Reel section of this manual.
*This is to assist in the reloading of Splitline® only. These instructions
are NOT part of the fast assembly instructions. Line does not need to
be installed on the initial assembly and start-up.
Slot
Bracket
Min. 6"
Español — Page 11
English — Page 1
Français — Page 6
Electric Starter or Power Start Bit Optional!
THESE OPTIONAL ACCESSORIES ARE SOLD SEPARATELY!
This unit has an alternative starting method that many find easier to use than pulling on a rope.
Please contact a local retailer or call
1-800-828-5500
in the U.S., (
1-800-668-1238
in Canada), for more information.
Information may also be found at
www.troybilt.com or www.troybilt.ca
NEED HELP?
CALL 1-800-828-5500 IN U.S. OR 1–800–668–1238 IN CANADA
TB21 EC
2-Cycle Trimmer
Operator’s Manual