Pull the deck support pin outward to release the deck from
6.
the deck lift arm. See Fig. 7-3.
Repeat the above steps on the tractor’s right side.
7.
Move the deck lift lever into the top notch to raise the deck
8.
lift arms up and out of the way.
Remove the bowtie cotter pin connecting the deck sway
9.
rod to the tractor frame. See Fig. 7-4.
Remove the cotter pin from the end of the stabilizer rod
10.
and slide the stabilizer out of the hanger bracket on the
deck. See Fig. 7-5.
Gently slide the cutting deck (from the right side) out from
11.
underneath the tractor.
Reinstall the belt keeper rod loosened earlier.
12.
CAUTION:
Failure to reinstall the belt keeper rod
may result in serious damage to your tractor’s PTO
system.
Figure 7-5
Figure 7-3
Deck Lift Arm
Deck Support Pin
Figure 7-4
25
s
ectiOn
7 — s
ervice
Summary of Contents for TB2450
Page 33: ...Notes 11 33...