16
TN19 121211-20
FIG. #10
FIG. #11
FRONT SCREWS
BACK SCREWS
Optional Side
Shield Installation
1. Loosen the two front screws approxiamately 1 - 2 turns
and remove the two back screws. Fig.#10
2. Insert the two pronged fl anges on the front of the side
shield under the front screws and tap gently backwards
until sitting tightly against screws. Fig #11
3. Align holes in rear of side shield with holes in fi rebox
side and secure tightly with screws previously removed.
Firebrick Installation
The package contains 20 full-size fi rebricks. With the
woodstove in the upright position, install fi rebricks as
follows:
1) Place 4 full-size fi rebricks against the rear wall.
2) Next install fi rebricks on the bottom of the unit. Use a
total of 8 full-size.
3) Finally install 4 full-size fi rebricks on each side of the
fi rebox as shown.
FIG. #12