CHAPTER 2: ASSEMBLY GUIDE
Truefitness.com / 800.426.6570 / 636.272.7100
15 of 36
ASSEMBLY STEPS:
STEP 1 Fold Up and Install Pedestal:
a)
Remove the container lid and top layer of parts
and packaging.
b)
Remove all loose parts and packaging materials.
c)
Leave the machine base on the shipping container
until Step 3.
d)
Lift the Pedestal into an upright position.
STEP 2 Install Step Up Tube and Cover:
a)
Attach the step tube to the rear of
the machine using the
2 M10 1.5 x 75mm bolts and
a 13mm socket.
b)
Attach the plastic step using the
4 M5 0.8 x 12mm screws.
Hardware Required :
e) Secure each Pedestal to the Base
using 6 M10 1.5 x 20mm bolts and
an 8mm allen wrench.
Hardware Required:
12 M10 1.5 x 20mm Bolts
4 M5 0.8 x 25 mm Bolts
2 M8 1.25 x 70mm Bolts
M10 1.25 x 70mm bolts
M5 0.8 x 25 bolts
Summary of Contents for SPECTRUM ELLIPTICAL XS1000
Page 10: ...Truefitness com 800 426 6570 636 272 7100 10 of 36 CHAPTER 1 SAFETY INSTRUCTIONS...
Page 23: ...CHAPTER 2 ASSEMBLY GUIDE Truefitness com 800 426 6570 636 272 7100 23 of 36 WIRING DIAGRAM...
Page 24: ...CHAPTER 2 ASSEMBLY GUIDE Truefitness com 800 426 6570 636 272 7100 24 of 36 EXPLODED DIAGRAM...