CHAPTER 2: ASSEMBLY GUIDE
Truefitness.com / 800.426.6570 / 636.272.7100
20 of 36
ASSEMBLY STEPS:
STEP 10 Install Draw-Bars:
b) Slide each drawbar onto its shaft and
install and fully tighten M10 1.5x75mm
bolt, flat washer and M10 nut with a 17mm
socket and wrench.
c) Tighten the bottom 8 bolts with 6mm
allen wrench.
Hardware Required:
STEP 11 Install Pedal Tubes:
a) Use 2 M10 x 80 mm bolts and 2 M10 nuts
to attach the Pedal Tubes, but do not fully
tighten.
Hardware Required:
b) Ensure that the Pedal Tubes are centered
on the crankshaft rollers.
c) Fully tighten the pedal tube bolts.
2 M10 x 75mm Bolts
2 M10 x 80 mm bolts
2 M10 Nuts
2 M10 Nuts
2 Flat Washers
Summary of Contents for SPECTRUM ELLIPTICAL XS1000
Page 10: ...Truefitness com 800 426 6570 636 272 7100 10 of 36 CHAPTER 1 SAFETY INSTRUCTIONS...
Page 23: ...CHAPTER 2 ASSEMBLY GUIDE Truefitness com 800 426 6570 636 272 7100 23 of 36 WIRING DIAGRAM...
Page 24: ...CHAPTER 2 ASSEMBLY GUIDE Truefitness com 800 426 6570 636 272 7100 24 of 36 EXPLODED DIAGRAM...