True Professional 24 Series Installation Guide
4
1. Set unit in its final location. Be sure there is adequate ventilation in
your room.
2. Proper leveling of your True unit is critical to operating success
(for non-mobile models). Effective condensate removal and door
operation will be effected by leveling. Adjust leg levelers on the front
and back of the cabinet if it needs to be lowered or raised.
3. The unit should be leveled from the interior of the unit front to back
and side to side with a level. If the refrigerator is not level adjust the
stainless steel leg levelers. The leg levelers can be adjusted by turning
to reach the desired leveling height as shown in the illustration below.
4. Free plug and cord from back of cooler (do not plug in).
5. The unit should be placed close enough to the electrical supply so
that extension cords are never used.
6. Once installed in final location, insert toe kick by clipping in place.
WARNING: COMPRESSOR WARRANTIES ARE vOID IF
THE UNIT IS MORE THAN 7 FT. (2.1M) FROM PLUG-IN
CONNECTION OR IF AN ExTENSION CORD IS USED.
LEVELING REFRIGERATOR
Summary of Contents for TBC-24-R/L-OG-A
Page 13: ...NOTES ...
Page 38: ...NOTES ...
Page 57: ...NOTES ...
Page 58: ...NOTES ...
Page 59: ...NOTES ...