True Professional 24 Series Installation Guide
22
22
Tools Needed:
• Phillips Screwdriver
• 1/8” Drill Bit
SEE PAGE 14 FOR OvERLAy PANEL DIMENSIONS
BEFORE INSTALLING.
FOR EASy OvERLAy INSTALLATION, DRAWER FRONT
REMOvAL IS REQUIRED.
1. Open the drawer and detach the front drawer panel
by removing four #2 Phillips screws (two on each
side). (See image 1). Save all these screws for later
reinstallation.
2. Remove front drawer panel gasket. (See image 2)
3.
Using a 1/8” drill bit, drill out the eight pilot holes
(each drawer) from the front of the drawer panel. Drill
completely through the panel. (See image 3).
4. Attach drawer handle to the front of the overlay
panel. Attach handle before step 5. (See image 4).
5. Lay overlay panel face-down on a safe solid surface.
Lay drawer panel face-down on top of the overlay
panel. Align panels and secure with a clamp. Lay
cardboard or other soft or safe material down before
working on drawer front. (See images 5 & 5a)
1
4
5
3
2
DRAWER OVERLAY PANEL INSTALLATION
Back of drawer
Front of
drawer
Summary of Contents for TBC-24-R/L-OG-A
Page 13: ...NOTES ...
Page 38: ...NOTES ...
Page 57: ...NOTES ...
Page 58: ...NOTES ...
Page 59: ...NOTES ...