ARENA CONCRETE TABLE
INSTALLATION INSTRUCTIONS
Thank you for choosing Trueform Concrete.
ARENA is an all-concrete table defined by
bold lines and an air of strength and solidity.
24 stainless steel panhead screws, 3/4” long
SKU: TBL-ARENA-DIN
Power drill
Phillips-Head bit
Phillips-Head screwdriver
Measuring Tape
Large Level
Hardware Provided
Items Required
Place the legs in their intended final locations
with the mounting brackets facing up. Ensure
the legs are spaced the appropriate distance
apart and in line with each other. The chart on
the right indicates the distance between legs
based on table size.
If you purchased a
custom-sized ARENA, follow the same
directions while referring to the overhang
dimensions provided in your technical drawing.
Use a level to ensure the legs are level both
vertically and horizontally and to each other.
Use the leveling feet to make any adjustments.
Note that the feet can also be removed.
Positioning the legs
This table is shipped in separate pieces in order to prevent damage from transit. Light assembly is
therefore required. These pieces are heavy, so installation will require at least two people.
For the best results,
please read these instructions in their entirety
to understand the complete
process before you begin.
10 feet / 119” x 48“
11 feet / 132” x 48“
12 feet / 144” x 48“
13 feet / 156” x 48”
14 feet / 168” x 48”
8.5”
14”
19”
24”
29”
LEG 1
LEG 2
LEG 3
TABLE SIZE
D
(DISTANCE)
D
D
PAGE 1 of 2