To install the 8oz. (250cc) or 3oz. (88cc) cup assembly, first install the material adapter, A4150. Locate the material connector
(#29, page 33) and screw the material adapter on. Follow the installation instructions for the 1 quart (1 liter) cup assembly.
3.4.2 Installing A Gravity Fed Cup Assembly (Turbine Air Only).
1. Locate the cap (#11, page 33) that blanks the unused material connection and make
sure that it is installed onto the bottom material connection (#29, page 33).
2. Screw the top feed cup to the top material connection (#30, page 33) and tighten with
the wrench (spanner). You are now ready to spray.
3. Sometimes when spraying heavy materials cup pressure is required. If cup pressure is required, remove the stainless
steel screw located in the side of the spray gun and replace it with the brass air feed connector (#22, page 33). This is
where your air hose joins the spray gun from the cup.
Summary of Contents for Apollo 7500 AtomiZer
Page 32: ...8 Diagram Parts List...