Support: 1-855-473-7449 or 1-408-943-4100
Email:
Page 9
5.2 Network Cables
Connect network cables before powering on the M-Series System. Cable specifications and requirements vary by
configuration, so they are not included with the system. It is also recommended to connect network cables from the
local switch or management network to the Out-of-Band (OOB) IPMI management port on each TrueNAS Controller.
Refer to the network port labels in section
“1.2 Front Panel Indicators” on page 2
are preconfigured to customer specifications before shipment.
5.3 Power Cord
Connect a power cord to the back of one power supply, pressing it into the plastic clamp and pressing on the tab to
lock it in place. Repeat the process for the second power supply and cord.
After both power cords have been connected to the M-Series, they can be plugged in to power outlets. The system
is configured to automatically power on when connected to a power outlet. This design ensures that the M-Series
automatically turns back on when power is restored after a power failure.