S. 12
Installation and Comissioning
For safety reasons, the manufacturer recommends that this equipment be installed, serviced and
repaired by a Service Dealer or installation technician who is familiar with applicable codes,
standards and regulations. The operator also must comply with all such codes, standards and
regulations.
Follow these steps one after the other to avoid any problems.
Preparation Before Startup
Before commissioning check all components of the system for cracks, broken
leads, signs of overheating, sharp edges or other physical damage. If defective
components are found, replace them with like components. Use a multimeter
to check components for electrical shorts or open circuits.
Consider that the system must have at least 4 inches clearance from walls to guarantee sufficient air
circulation to avoid heat build-up. The system should be placed on flat surfaces only. If necessary
adjust the feet of the cabinet.
Make sure the water line is closed and the power supply is turned off and unplugged.
Water Connection
For proper function the water connection needs to provide at least 3 bar (44psi) and at max 10 bar
(145 psi) of water pressure. Before connecting the water line make sure it is installed properly by a
plumber service.
Never change any parts of the water line yourself!