AutoVap15 Operating Manual | | v. 1.2
11 / 23
1.
Locate the Feed Line and either attach it to your feed vessel or, using a dip stick, place the feed line
into your barrel.
2.
Open the Feed Line Ball Valve
Tincture will now flow through the feed line and up through the preheater.
Note: After a 10-15 seconds the feed line and feed pump should be primed and the feed pump can be
turned on.
STEP 3: START FEED PUMP
Now that the feed pump is primed, you are now ready to start the feed pump and adjust the preheater
pressure.