STAGE 2: PLACE EQUIPMENT
Important things to consider when placing your equipment:
1) The chiller exhausts a large amount of hot air. We highly suggest placing the chiller
outside of your facility, either on a concrete slab or on the roof. If this is not possible,
please confirm with the chiller manufacturer if your facility has adequate air flow and
space for the chiller to run inside. Placing an HVAC exhaust system on the chiller is also
an option for indoor use.
2) The water heater is a crucial part of your AV30 system. It is important to get
maximum efficiency out of your water heater. The flow rate of the water heater will be a
determining factor of the efficiency of the heat as the AV30 recovers solvent.
To ensure maximum flow rate, the water heater should be placed as close to the AV30 as
possible and the plumbing should have a few 90 degree turns as possible. The plumbing
run should have as little vertical differential as well.
3) The recirculating water pump, which is part of the water heater manifold, is what
essentially powers on the water heater each day. It is advised to have your electrician
connect this pump to a wall switch that is easily accessible by your operators.
4) The vacuum pump, similar to the recirculating pump, should be placed on it's own wall
switch for convenience.
Note: place on a separate wall switch from the recirculating
pump.