Page 11
See assembly plan (page 18)
Replacing the rubber belt:
1. Dismantling the rubber belt:
Method and sequence:
•
Detach bolts no.6.
•
Remove intermediate part no.5 at the front of the conveyor belt.
•
Detach the cover plates no.18
•
Remove belt scraper no.9 by pulling it over the hinge points (side by side).
•
Loosen nuts no.14 and remove supporting roller no.16.
•
Unblock nuts no.3 and take the depth at which bolts no. 4 are screwed in as the reference
measurement.
•
Loosen bolts no.4 (fully).
•
Lift the accompanying roller out of the groove (upwards) and take it out of the frame.
•
Hook the belt above the guidance grooves.
•
Take the rubber belt away, starting with the driving roller.
•
IMPORTANT: make sure that the driving roller does not move out of the slides!
•
Ensure that the motor cable is lying in the safety groove.
2. Assembling the rubber belt.
Method and sequence:
• Assemble the belt in the reverse order to dismantling.
3. Adjusting the rubber belt for tension.
Method and sequence:
•
Screw bolts no.4 tight alternately until the tightening depth is reached!
4. Adjusting the rubber belt for parallelism.
Method and sequence:
• If the belt runs against the frame on one side, tighten screws no. 4 by a ¼ turn at the side where the
belt touches the frame (or loosen the screws on the opposite side).
•
Allow the belt to turn by a few belt lengths and check it in the meantime.
WARNING: CAUTION is advisable.
This work is NEVER done while the conveyor belt is running or electrically powered.
AVOID ACCIDENTS.
IMPORTANT:
•
Never replace parts when the belt is electrically powered.
•
Only use original components at replacement.
•
Replacements or repairs other than those listed in these user instructions
(especially the electrical aspects) can only be executed by technically competent staff).
USER INSTRUCTIONS
6. REPLACING COMPONENTS