saue
25
Series 90 Start-Up 5
The following start-up procedure should always be
followed when starting-up a new Series 90 installa-
tion or when restarting an installation in which either
the pump or motor had been removed.
WARNING
The following procedure may require the ve-
hicle/machine to be disabled (wheels raised off
the ground, work function disconnected, etc.)
while performing the procedure in order to
prevent injury to the technician and bystanders.
Take necessary safety precautions before
moving the vehicle/machine.
Prior to installing the pump and/or motor, inspect the
units for damage incurred during shipping and han-
dling. Make certain all system components (reser-
voir, hoses, valves, fittings, heat exchanger, etc.) are
clean prior to filling with fluid.
Fill the reservoir with recommended hydraulic fluid.
This fluid should be passed through a 10 micron
(nominal, no bypass) filter prior to entering the reser-
voir. The use of contaminated fluid will cause damage
to the components, which may result in unexpected
vehicle/machine movement. See the publications
BLN-9887 and SDF 697581 for further related infor-
mation.
The inlet line leading from the reservoir to the pump
must be filled prior to start-up. Check inlet line for
properly tightened fittings and make sure it is free of
restrictions and air leaks.
Be certain to fill the pump and/or motor housing
with clean hydraulic fluid prior to start up. Fill the
housing by pouring filtered oil into the upper case
drain port.
Install a 50 bar (or 1000 psi) pressure gauge in the
charge pressure gauge port (see
tion) to monitor the charge pressure during start-up.
It is recommended that the external control input
signal (linkage for MDC, hydraulic lines for HDC, or
electrical connections for EDC) be disconnected at
the pump control until after initial start-up. This will
ensure that the pump remains in its neutral position.
WARNING
Do not start prime mover unless pump is in
neutral position (0
°
swashplate angle). Take
precautions to prevent machine movement in
case pump is actuated during initial start up.
“Jog” or slowly rotate prime mover until charge pres-
sure starts to rise. Start the prime mover and run at
the lowest possible RPM until charge pressure has
been established. Excess air may be bled from the
high pressure lines through the high pressure system
gauge port.
Once charge pressure has been established, in-
crease speed to normal operating RPM. Charge
pressure should be as indicated in the pump model
code (see
). If charge pressure is inad-
equate, shut down and determine cause for improper
pressure. Refer to Troubleshooting
WARNING
Inadequate charge pressure will affect the
operator’s ability to control the machine.
Shut down the prime mover and connect the external
control input signal. Also reconnect the machine
function if disconnected earlier. Start the prime mover,
checking to be certain the pump remains in neutral.
With the prime mover at normal operating speed,
slowly check for forward and reverse machine opera-
tion.
Charge pressure may slightly decrease during for-
ward or reverse operation. Continue to cycle slowly
between forward and reverse for at least five minutes.
Shut down prime mover, remove gauges, and plug
ports. Check reservoir level and add filtered fluid if
needed.
The transmission is now ready for operation.
5. Initial Start-Up Procedure
CONTENTS
Summary of Contents for PTV100/72
Page 11: ......
Page 12: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 44: ......
Page 54: ...Contents iv 032015 PN 4 ...
Page 175: ...Troubleshooting 70 35 032015 PN 133 ...
Page 187: ...Troubleshooting 70 47 032015 PN 145 ...
Page 205: ...Warranty DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 90 6 032015 PN 163 ...
Page 213: ...Warranty DX EMISSIONS CARB 19 01AUG14 8 8 RG26036 UN 24JUN14 90 14 032015 PN 171 ...
Page 214: ...Warranty 90 15 032015 PN 172 ...
Page 220: ...Engine Registration IBC 2 032015 PN 178 ...
Page 223: ...Engine Registration IBC 5 032015 PN 181 ...
Page 224: ...Engine Registration IBC 6 032015 PN 182 ...
Page 225: ...SERVICE MANUAL ...
Page 262: ...saue Axial Piston Pumps and Motors Service Manual Series 90 CONTENTS ...
Page 348: ...saue 87 Series 90 Exploded View Parts Drawings 10 Notes CONTENTS ...
Page 350: ......
Page 351: ......
Page 352: ......
Page 353: ......
Page 354: ......
Page 355: ......
Page 356: ......
Page 357: ......
Page 358: ......
Page 359: ......
Page 360: ......
Page 361: ......
Page 362: ......
Page 363: ......
Page 364: ......
Page 365: ......
Page 366: ......
Page 367: ......
Page 368: ......
Page 369: ......
Page 370: ......
Page 371: ......
Page 372: ......
Page 373: ......
Page 374: ......
Page 375: ......
Page 376: ......
Page 377: ......
Page 378: ......
Page 379: ......
Page 380: ......
Page 381: ......
Page 382: ......
Page 383: ......
Page 384: ......
Page 385: ......
Page 386: ......
Page 387: ......
Page 388: ......
Page 389: ......
Page 390: ......
Page 391: ......
Page 392: ......
Page 393: ......
Page 394: ......
Page 395: ......
Page 396: ......
Page 397: ......
Page 438: ......
Page 439: ......
Page 440: ......
Page 441: ......