OPERATOR’S MANUAL
ISO
6
Version 4 UL 2_3 Manual
GEOMETRY / 113
6011258 Rev C
Figure 77
24 Row Planter 1 Control Channel X/Y Coordinate Example
IMPORTANT
It is critical to enter the exact distances required when
setting up the physical layout of the implement position. It
is strongly suggested that a tape measure is used to
ensure exact measurements. Failure to enter accurate
measurements of the implement control channels will
impact the system’s performance to shut row sections off
at the proper location within the field.
Figure 78
Geometry Summary Screen