OPERATOR’S MANUAL
ISO
6
Version 4 UL 2_3 Manual
GEOMETRY / 117
6011258 Rev C
IMPORTANT
Verify that all channels align correctly and no channel
overlap occurs. Failure to enter accurate measurements of a
control
channel’s position will impact the system’s
performance to shut row sections off at the proper location
within the field.
NOTE
Liquid channels must enter the Y coordinate on the channel
preview setup page if there is more than one channel. Planter
and granular channels cannot edit the Y on the channel
preview screen, and only modify it on the hitch type selection
page.
Figure 83
Enter Control Channel Positions “X” Coordinate