OPERATOR’S MANUAL
114 /
GEOMETRY
ISO
6
Version 4 UL 2_3 Manual
6011258 Rev C
TO ENTER X/Y COORDINATES:
1. Press the
GEOMETRY
button.
2. At the Geometry screen, press the
GEOMETRY SETUP
button.
-
The tractor/implement illustration on the Geometry
screen (Figure 78) is a visual indicator of
channel/implement layout once dimensions are entered
at the Geometry Setup screen.
3. At the Geometry Setup screen, select the implement type
used that matches the equipment.
Figure 79
Select Implement Type
4. At the Geometry Setup screen, enter the X and Y
coordinates for the implement type selected. Measurements
for each implement type defined below.
-
Note that -Y is to the left of the hitch, +Y is to the right of
the hitch, -X is further behind the tractor and +X is
towards the tractor with respect to the hitch.
THREE-POINT HITCH TYPE
A) Enter the distance (Y value) from implement center to channel
center left and right. If implement bar is offset from 0, enter the
size of the offset. This value is typically 0.