Beijing TT Aviation Technology Co., Ltd.
Add: No.1 TTA Building, Niantou Industrial Park ,Changping District,Beijing, China
www.ttaviation.com
17
3.2 Launch
1)
Before starting make sure the color of controller LED turns as the Three position
switch, (refering to Trouble shooting chapter)
2) Switch the three-position switch to “run”, and monitoring the UAV input voltage.
3
)
Voltage should stay above 49V stably.
Launch - Idle - OFF