Ac2/+4
-
Section 4 - Transportation 4-2
1. Remove center dolly
(1)
, from outer dolly position
(2)
, and insert into center dolly position
(3)
.
2. Secure center dolly
(1)
, with ¾” washer
(4)
, and
lynch pin
(5)
.
Offset Hitch
The offset hitch is used when the Accumulator is being
pulled behind an ATV or truck. Below you will find an
outline of its functions.
The offset hitch consists of 3 main components
1. Hitch tube assembly
2. Hitch offset assembly
3. Hitch tube brace
The offset hitch gives the operator the ability to set the
distance, or offset the Accumulator to the right, or to the
left.
Loosen ½-13 bolt
(4)
, and nut
(5)
, and set hitch tube
brace
(3)
, in desired hole location on the hitch tube
(1)
,
and reinsert bolt
(4)
, and nut
(5)
.
Towing with Baler
Summary of Contents for Accumul8
Page 5: ...1 1 Section 1 Specifications Accumul8 2 4 Section 1 Specifications Dimensions...
Page 26: ...Accumul8 2 4 Section 4 Transportation 4 6 6 Set bale slide 13 to it s raised position...
Page 40: ...Accumul8 2 4 Section 7 Parts Breakdowns Lists 7 1 Section 7 Parts Breakdowns Lists...
Page 41: ...7 2 Section 7 Parts Breakdowns Lists Accumul8 2 4 Bale Chute All Models...
Page 43: ...7 4 Section 7 Parts Breakdowns Lists Accumul8 2 4 Wheels Axles All Models...
Page 45: ...7 6 Section 7 Parts Breakdowns Lists Accumul8 2 4 Bale Gate All Models...
Page 47: ...7 8 Section 7 Parts Breakdowns Lists Accumul8 2 4 Front Bale Guides All Models...
Page 49: ...7 10 Section 7 Parts Breakdowns Lists Accumul8 2 4 Endgate All Models...
Page 53: ...7 14 Section 7 Parts Breakdowns Lists Accumul8 2 4 Swing Arms AC1000...
Page 58: ...Intentionally Left Blank...
Page 59: ...VII Torque Value Chart Imperial Accumul8 2 4 Torque Value Chart Imperial...
Page 60: ...Accumul8 2 4 Torque Value Chart Metric VIII Torque Value Chart Metric...
Page 63: ......