A
C
B
Self Loading Balefeeder BF5000SL
-
Section 3: Pre-Operation 3-1
Section 3: Pre-Operation
Initial Setup
Your BF5000SL may need some pre-assembly prior to first use. In some circumstances the tongue
and bale spears may be removed for shipping and need be installed. Optional features may also be
shipped seperately and need to be installed. All needed fasteners are provided by manufacturer.
Hitch Installation
The front hitch is connected to the main frame
by a 3/4” lock nut and 3/4” x 6” hex bolt through
the rear of the tube
(A)
and through the front
of the frame
(B)
with two 1/2” x 5.5” hex bolts,
two 1/2” nuts and BF5000-245 hitch bracket
(C)
. The hose support and jack may also need
to be installed as shown in illustration to left.
Bale Spear Installation
The bale spears must be attached to the bale
fork to the rear of the machine.
NOTE:
Supplied conus nuts are the only
supported fasteners to secure bale spears.
Summary of Contents for BF5000SL
Page 9: ...Self Loading Balefeeder BF5000SL Section 2 Safety 2 3 Safety Decal Locations...
Page 34: ...8 12 Section 9 Parts Breakdowns Lists Self Loading Balefeeder BF5000SL Loading Arm...
Page 44: ...10 1 Torque Values Imperial Self Loading Balefeeder BF5000SL Torque Values Imperial...
Page 45: ...Self Loading Balefeeder BF5000SL Torque Values Metric 11 1 Torque Values Metric...
Page 48: ......