6-2
Section 6: Maintenance
-
Self Loading Balefeeder
BF5000SL
Grease Point - Cylinder Pivot
Apply 3 strokes of grease every 50 hours at point
(4) (4 locations).
Grease Point - Hub
Apply 3 strokes of grease every 50 hours at point
(5) (2 locations).
Grease Point - Linkage Assembly
Apply 3 strokes of grease every 25 hours at point
(3) (4 locations).
Grease Point - Bumper Bearing (if
equipped)
Apply 3 strokes of grease every 50 hours at point
(6) (2 locations).
Summary of Contents for BF5000SL
Page 9: ...Self Loading Balefeeder BF5000SL Section 2 Safety 2 3 Safety Decal Locations...
Page 34: ...8 12 Section 9 Parts Breakdowns Lists Self Loading Balefeeder BF5000SL Loading Arm...
Page 44: ...10 1 Torque Values Imperial Self Loading Balefeeder BF5000SL Torque Values Imperial...
Page 45: ...Self Loading Balefeeder BF5000SL Torque Values Metric 11 1 Torque Values Metric...
Page 48: ......