background image

4:)

The next step is to insert the side panels and the front directly into the existing 
grooves of the base plate. The ventilation slots point to the rear because the power 
supply is there and the components have to be cooled.

5:)

The LCD protective screen is carefully screwed together with 4 screws / nuts on the 
top side of the housing.

Reviews: