25
10.2
Conducting a test run
To initiate the mode where the manure remote-control can be calibrated, press the
Stop/OK and L1 keys. The spindle engine’s stroke as a percentage of the whole stroke
and the corresponding amount of fertilizer to be sown (kg/ha) will then be displayed.
Next, adjust the percentage for the spindle engine (with the plus and minus keys) to
the desired position for the test run (the recommended value is 50%, which indicates
that the feed roller is in its middle position) and press the Stop/OK key. The spindle
engine now sets the feed rollers to the middle position. Next, conduct a test run in
accordance with the instructions for the given seed fertilizer, enter the measurement
result into the “amount to be sown kg/ha” field, and accept with the Stop/OK key. The
basic view of the display will then be restored. The remote control has now been
calibrated, and you can select the values of your choice for the quick-selection keys.
One test run affects all the quick-selection keys simultaneously.
Figure 22. A test-run setting
11
Hectar counter of Agrocont
There in basic-Agrocont unit are four pieces of hectar counters: dha 1 to dha 4. You
can use those as trip-counters. Each of them is possibleto set to zero by activating it,
and pressing stop/ok-key and extra lift key simultaneously.