GB
O w n e r ’ s m a n u a l • P u r e R o w 8 . 1
9
• Finish the rear leg assembly by
installing the second rear leg bolt (13)
and washer (5).
• Tighten both front and rear bolts.
Be careful tightening bolts to prevent
scratches
Assembly step 7
For the next assembly step, you will
need:
• seat rail assembly (previously
assembled)
• main frame (1)
• 2x horizontal seat rail bolts
(M10x120mm) (4)
• 2x washer (5)
• 2x nylock nuts (6)
Assembly step 8
Insert the seat rail until it just slightly
protrudes behind the footplate. Shown
above is the installation / alignment point
for the M10x120mm horizontal seat rail
bolt (4), M10 washer (5) and nylock nut
(6)
Assembly step 9
Install and secure the two bolts (4) and
two washers (5) with the nylock nuts (6).
Assembly step 10
• Install the vertical seat rail bolt (7)
with plastic dome cap (8) through the
seat rail assy.
• Fit the vertical seat rail bolt dampener
(21) onto the bolt end sticking out of
the seat rail assy.
NOTE
The vertical seat rail dampener is
designed to take up the slack between
the seat rail and mainframe when the
rower is stored / standing in a vertical
position.