3
INSTALLATION
INSPECTION FOR DAMAGE
Customer is responsible for checking for damage. First inspect crate as soon as it
arrives. Prior to signing if crate is damaged make sure you note that on bill of lading.
LEVELING OF BAKERY CASE
Four leveling legs are provided for leveling Bakery Case.
Use a leveler to make sure unit is leveled on all four corners.
If unit is not leveled drainage of water will not drain properly and doors will not close
properly. Leveling legs can be adjusted accordingly.
LOCATION OF BAKERY CASE
Installation Clearance :
86 inch at the top, 20 inch at the rear and 12 inch at the cash inside.
CAUTION :
Damage to case and glass can result if pushed on. Do not push curved
glass, end glass, doors or door frames.
Do not place Bakery Case in the following locations ; near source of heat, excessive air
movement, open doors, and direct sunlight.
Move the Bakery Case to the final location before removing shipping skid.
Condenser is in back of Bakery Case. Do not block inlet.
If after uncrating there is concealed damage and crate was in good condition you must
call Customer Service at Turbo Air. Concealed damage must be reported within
24 hours of receiving unit. Bill of lading will be requested faxed to claim department.
Pictures may be requested of unit and crating.
Summary of Contents for TCB-5R
Page 6: ...6 WIRING DIAGRAM TCB 5R...