background image

PHOTO P

2 1/4"

EASY FLUSH MEASUREMENTS:

PRACTICAL INFORMATIONS

Weight ................73 lbs, 33 Kg 
Width ...................± 24 1/4", ± 61 1/2 cm 
Length.................± 34", ± 86 cm 
Height .................± 20 1/2", ± 52 cm 
Base height .......± 5 3/4", ± 14 1/2 cm

Airlock Preventer  

Hole 5/8"

5

PHOTO N

PHOTO O

STEP 19

Install your toilet in the desired location with 

a wax ring and bolts. Slide the brass screws in 

the proper slot position. Hook up the water 

line, turn it on and check for leaks. Flush the 

toilet and allow the pump to cycle and insure 

a proper operation. Toilets with less than a 1.6 

gallon flush are not recommended for use in  

our "EASY FLUSH" System. For a better 

performance and to create a better water flow, 

it is recommended that the unit is flushed twice, 

from time to time.

STEP 20

Cut another short piece of foam seal (3 3/4")  

and glue it to the appropriate space inside the 

lid of the tank. (

Photo N

)

STEP 21

After completing the pump installation, fix 

the lid using the bolts. This will seal the wires. 

Fasten the top lid by using screws and washers. 

(

Photo O

)

STEP 22 

"

OPTION

"

To install an additional shower or sink 

unit to the "Easy Flush" System, use the 

additional 2" "Aqua Flex" gasket. The extra 

fixture piping must be installed on the 

same side as the illustration (Photo P) to 

prevent direct water flow on pump switch.  

Drill a 3" hole on the illustrated side of the 

basin.

 It is mandatory to connect the 

piping above the base of the unit 

(

Photo P

), to prevent any waste water 

back flow in the additional fixtures. 

 

It’s also required that the center of the 

gasket hole should not be less than 2 1/4" 

from the base.

 Failure to drill the 3" hole in 

proper location will void the unit warranty. 

It is also recommended that if you hook up 

more than one fixture, that these two or more 

be connected to the same discharge piping.  

Each additional unit must also be vented.

Summary of Contents for T40040

Page 1: ...alve present will permit the sewage to flow 8 Observe that the plumbing can pump the sewage safely out of the residence Repeat this step monthly SAFETY INTRUCTIONS Before installation and operation follow these procedures A Check with your local electrical and plumbing codes to ensure you comply with the regulations These codes have been designed with your safety in mind Be sure you comply with th...

Page 2: ... in accordance with local and national codes Never remove the ground pin from the plugs they are supplied for your protection STEP 5 Install the rubber gasket under the lip of the cast iron flange as illustrated on photo B This gasket will assure a perfect seal Install the cast iron flange on the tank in a suitable position that will enable you to choose the proper alignment for the type of toilet...

Page 3: ...ntil the elbow becomes in contact with the rubber grommet Photo F G STEP 11 Cut a short piece of foam seal 3 3 4 as the basic wire slots seal then glue it to fit the sloats shape Photo H I STEP 12 Then cut the full length foam seal for this side of the tank Photo J Glue this full length to the tank over the previous small piece STEP 13 Using a screwdriver make pilot holes into the foam seal to all...

Page 4: ...tem is sold with two 2 possible types of switch Follow the instructions for the type supplied with your unit Mechanical switch Photo L or vertical switch Photo M MECHANICALSWITCH Theswitchisattachedto the basin cone shape adapter which activates the pump on a 30 angle No other type of mechanical switch will work effectively It must be installed as illustrated and the lenght of electric cord over t...

Page 5: ...e inside the lid of the tank Photo N STEP 21 After completing the pump installation fix the lid using the bolts This will seal the wires Fasten the top lid by using screws and washers Photo O STEP 22 OPTION To install an additional shower or sink unit to the Easy Flush System use the additional 2 Aqua Flex gasket The extra fixture piping must be installed on the same side as the illustration Photo...

Page 6: ... gasket enclosed STEP 6 Align and install the flange Use the short screws nuts O rings and washers STEP 7 Align the pump with the cavities inside the basin STEP 12 Apply the seal STEP 13 Make pilot holes into the foam seal to allow the bolts of the lid STEP 19 Install the wax ring and the toilet Use long brass screws nuts and washers STEP 5 Install the flange Do not forget the O ring between the t...

Page 7: ...pacitor 17 400369 Motor casing 18 400370 Top gasket 19 400371 Seal plate O ring 20 400374 Oil seal bushing 22 400375 O ring motor base 2 23 450700 Cable screw of handle 4 24 450701 Bolts housing cover 8 25 450702 Screws 4 26 450703 Base plate screws 3 27 300485 Discharge adaptor 28 450704 Capacitor clamp 29 450705 Long bolts 4 US GPH LPH 5 4900 18550 10 3900 14765 15 3000 11350 20 2200 8325 25 600...

Page 8: ...installed backward Improper voltage Pump may be airlocked Pump discharge head too high Clogged inlet impeller Clogged check valve Defective switch Missing check valve Clogged check valve in open position Float obstruction Clogged inlet Turn switch to ON position Replace Reset Re install Clean Remove obstruction and verify movement Replace Replace Add water and check Motor will reset automatically ...

Page 9: ...d and are part of a traditional sewage system This is a typical way to complete your installation project without breaking the concrete floor of your basement and to eliminate the disadvantage of a mess built up This document is step by step instructions to plan your project Please refer to our installation instructions booklet page 2 to 5 for technical assembly procedures PLUMBING HIDDEN INSTALLA...

Page 10: ...the drainage pipe of the sink coming from the left side of the tank STEP 5 The next step consists in covering the tank A 3 8 plywood on all floor area except for the tank Because 2 X 6 boards are generally a 5 1 2 in height it will be necessary to adjust to position the top of the tank 3 8 higher than 2 X 6 In order to do this we suggest to slide a piece of 3 8 plywood under the base to highten th...

Page 11: ... step is to carve a circular opening of a diameter of 1 2 larger than a flange at the proper place to be able to cover the base of the tank Photos 12 and 13 STEP 9 At this step it is the time to screw the gypsum board on the 2 X 4 and finish the installation of the toilet cabinet by fixing same to the flange Photos 14 and 15 See on page 9 the completed typical project NOTES PHOTO 9 PHOTO 10 PHOTO ...

Page 12: ...NOTES ...

Reviews: