Rigging Manual
31
7.0.1 Required Components
Item
Quantity
TBV118L Cabinet
2 (maximum)
TBV123 Cabinet
3 (maximum)
7.0.2 Preparation
Use the EASE FOCUS II software application to design your system to suit the
venue. This will calculate the coverage of the ground stack.
7.0.3 Location
The TBV118L subwoofer should be located on a flat, horizontal, and dry surface,
capable of supporting the weight of the complete assembly.
7.0.4 Measured Weights
Please see Section 2.3 Weights on Page 9, and refer to EASE Focus Rigging
Parameters when designing your system.
Chapter 7: Assembling a TBV118L Subwoofer and TBV123 Ground Stack
The following procedure describes how to assemble a ground stack with a
TBV118L subwoofer as a base and and one or two TBV123 cabinets on top.
The TBV123 cabinet connects to the TBV118L subwoofer using the integral
mounting points and rigging pins. No tools are required.
!
!
WARNING
DO NOT EXCEED A TOTAL QUANTITY OF 2 TBV118L SUBWOOFER AND 3 TBV123
CABINETS FOR THIS GROUND STACK CONFIGURATION. FAILURE TO FOLLOW
INSTRUCTIONS MAY CAUSE PERMANENT INJURY OR DEATH.
7.0.5 Personnel
The following procedures shall be undertaken by experienced, certified,
qualified, and authorised personnel only. The procedures require the use of three
or more authorised persons.
Protective Headwear shall be worn
Protective Footwear shall be worn
Protective Gloves shall be worn
Protective Eyewear shall be worn
Practice Safe Lifting
Summary of Contents for TBV118L-AN
Page 50: ......