34
TBV123 / TBV123-AN and TBV118L / TBV118L-AN Rigging Manual
8.0.1 Required Components
Item
Quantity
TBV123-FB Flybar
1
TBV123 Cabinet
3 (maximum)
8.0.2 Preparation
Use the EASE FOCUS II software application to design your system to suit the
venue. This will calculate the coverage of the ground stack.
8.0.3 Location
The TBV123 array ground stack should be located on a flat, horizontal, and dry
surface, capable of supporting the weight of the complete assembly.
8.0.4 Measured Weights
Please see Section 2.3 Weights on Page 9, and refer to EASE Focus Rigging
Parameters when designing your system.
Chapter 8: Assembling a TBV123 Array Ground Stack
The following procedure describes how to assemble a ground stack with TBV123
cabinets mounted on a TBV123-FB flybar as a base.
The TBV123 cabinets connect to each other and the TBV123-FB flybar using the
integral mounting points and rigging pins. No tools are required.
The purpose of the TBV123-FB flybar is to add stability and prevent the ground
stack from tipping backwards. Its main bar extends out behind the ground stack.
!
!
WARNING
DO NOT EXCEED A TOTAL QUANTITY OF 3 TBV123 CABINETS FOR THIS GROUND
STACK CONFIGURATION. FAILURE TO FOLLOW INSTRUCTIONS MAY CAUSE
PERMANENT INJURY OR DEATH.
!
!
WARNING
ALWAYS GROUND STACK THE TBV123 CABINETS WITH THE TBV123-FB FLYBAR TO
PREVENT TIPPING.
8.0.5 Personnel
The following procedures shall be undertaken by experienced, certified,
qualified, and authorised personnel only. The procedures require the use of three
or more authorised persons.
Protective Headwear shall be worn
Protective Footwear shall be worn
Protective Gloves shall be worn
Protective Eyewear shall be worn
Practice Safe Lifting
Summary of Contents for TBV118L-AN
Page 50: ......