background image

Page 

6

 of 

7

 

Chapter 2

 

 INSTALLATION 

Before proceeding to the installation of the turnstile, unpack all components and check 

to make sure the all parts from the packing slip are included, verify dimensions and conduit runs. 

Use the turnstile template to properly align and lay out the site and to determine the right 

location of the floor stub-ups and anchors. 

Site preparation: 

-

Make sure that the floor is level before the installation process starts.

-

When measuring the distance between the cabinets always refer to the center of
the cabinets, not the corners.

-

Using the factory provided template and design layout drawings outline the exact
position  of  each  turnstile.  Make  sure  the  floor  outline  includes  the  space
dedicated to conduit stub-ups.

-

Install  conduits  for  low  voltage  cables  and  for  110Vac  (220Vac)  power.  Size
conduits based on the number of cables and follow local installation codes.

-

On the turnstile floor footprint, locate anchoring holes. Drill and install foundation
screw bolts or M12 anchor bolts.

-

Align and install the turnstile cabinet on the anchor bolts. Secure the cabinet to
the bolts.

-

Follow wiring diagram to terminate the cables on the turnstile control panel. The
following connections are required:

o

Card reader to control panel reader port. The control panel can be located
inside the turnstile or outside.

o

Lane OPEN command from the turnstile to the access control panel door
open relay.

o

If  required,  an  emergency  open  button  or  switch  can  be  wired  to  the
turnstile controller board.

o

110Vac (220Vac) is required for each turnstile cabinet.

-

For physical installation setup refer to the following drawing.

-

 

-

 

Floor anchor installation 

Reviews: