9
TP9KACX / TP9KSCX
Jan 2017
STEP 5: (Installing OFFSIDE COLUMN & OVERHEAD BEAM ASSEMBLY)
NOTE: Install Overhead Beam assembly to top of columns BEFORE drilling anchors for Offside
column. This is to ensure that the Offside column can be properly positioned to be plumb and
level.
1. Raise OFFSIDE column and position at the designated chalk locations, ensuring the
Top Cap is pre-
installed to the top of the OFFSIDE column.
2. Assemble and mount the Overhead ‘padded’ Shut-Off Bar & Limit Switch assembly to the Overhead
Beam, as shown below in (Fig 6).
NOTE: Ensure to position the Limit Switch Box assembly on the same side as the Power Unit.
Fig. 6
3. Using a lifting device, raise the Overhead Beam assembly and position on top of the columns. Bolt it
to the columns using the bolts, nuts and washers, as shown in (Fig. 6).
4. Use a tape measure to measure the diagonal distance between the opposite corners of the base plates
on the columns. Equal values will ensure the lifting arms will be in square.
5. Secure OFFSIDE column to the floor following the same procedures as outlined in STEP 4.
Overhead Limit Switch Box
must be positioned on
same side as Power Unit
Summary of Contents for TP9KACX
Page 4: ...4 TP9KACX TP9KSCX Jan 2017 ...
Page 6: ...6 TP9KACX TP9KSCX Jan 2017 Fig 2a TP9KACX Asymmetric Lift Fig 2b TP9KSCX Symmetric Lift ...
Page 21: ...21 TP9KACX TP9KSCX Jan 2017 EXPLODED VIEW 1 ...
Page 22: ...22 TP9KACX TP9KSCX Jan 2017 EXPLODED VIEW 2 ...
Page 26: ...26 TP9KACX TP9KSCX Jan 2017 ...