Art.-Nr. 907.75.02.00
Stand 07/2019
- 4 -
GB
2
S c o p e o f d e l i v e r y
tubra
®
-FRISTA KL
KL2
KL3
KL4
KL5
KL6
FWS
2
3
4
5
6
Assembly set for 2 stations
consisting of a piping set, as-
sembly rails and fastening ma-
terial
1
Optional
1
Optional
2
Optional
2
Optional
3
Optional
Circulation set
for external
operation
Optional
Optional
Optional
Optional
Optional
Return flow switching
Optional
Optional
Optional
Optional
Optional
3
L a y o u t
Item
Description
Item
Description
1
Ball valve for heating flow (HF)
10
Control unit
2
Circulation pump
11
Bracket for control unit
3
Safety valve
12
Plate heat exchanger
4
Ball valve for heating return (HR)
13
Flow sensor 3,5-50 l/min
Type 235
5
Front: HW temperature sensor
Rear: immersion sleeve for sensor
14
Insulation plate for
6
Motorised ball valve for cold water (CW)
Plate heat exchanger
7
Servo motor for ball valve
15
Flush valve for cold water (CW)
8
Shut-off ball valve for hot water (HW)
16
Crosspiece with non-return valve
and hand vent valve
9
Flush valve/drain (HW)
17
Insulation