PERIODIC MAINTENANCE
2-37
CHAIN GUIDE BOTTOM (Drive chain guide)
Inspect at initial 500 - 750 km and every
3000 km thereafter. Replace the chain
guide bottom at every 9000 km.
l
Remove the hexagonal bolt (M6x20) from the
gear shift linkage assembly and dislocate the
gear shift linkage from the shaft gear shift.
(Fig. 2.101)
10 mm spanner
Tightening torque
12 ± 2 Nm
l
In-order to remove the foot rest assembly,
remove the swing arm axle nut along with
punched washer. Fig. 2.102)
(
17 mm spanner
Tightening torque
50 ± 5 Nm
l
Also, remove the hexagonal socket head cap
screw (M10x25 - 1 no.) along with punched
washer from the rider foot rest assembly and
take out the rider foot rest assembly.
(Fig. 2.102)
8 mm allen key
Tightening torque
18 ± 2 Nm
l
Remove the hexagonal flange bolt (M6x16 -
2 nos.) from the mounting of chain guide
bottom and take out the chain guide.
(Fig. 2.103)
10 mm spanner
l
Inspect the chain guide bottom and its bushes
for any damage / deformation. If found any
replace the guide / bushes with a new one.
(Fig. 2.104)
Note:
Please remember the chain guide bottom
must be replaced at every 9000 km
irrespective its condition.
l
Reassemble the parts in the reverse order of