6
EASY 1-MT
Issued 05/00
PREPARATION FOR START UP
1. Open the powder hopper filling cover.
2. Set the Airmover (if present) by turning the air valve
3. Fill with powder
Take care with the amount of powder, otherwise the fluidized
powder can escape from the cover.
4. Close the filling cover of the powder hopper again.
B) SWITCH THE BOOTH ON
Switch the powder coating booth on according to the operating
instructions.
C) FUNCTION CHECK
1. Press the main switch on the control unit. The yellow control
lamp in the switch illuminates.
The equipment carries out the calibration automatically. An
increase in sound can be heard inside the control unit. Both
displays show 888. The equipment is ready for operation after
not more than 20 seconds and switches to the factory settings.
2. Take the powder gun in the hand and point at a
grounded
object
in the booth, distance approx. 20 cm.
3. Press the gun trigger.
The LED No. 8 illuminates. The High-voltage is switched on and
powder is conveyed.
If all tests are positive, the control unit, and the powder gun are ready
for operation. If one of the functions is not operating as expected,
check this in the "Troubleshooting Guide", on pages 11 and 12.
A) FILLING THE POWDER HOPPER