VERA RF600i Assembly Instructions
34
4.16 Preparing the last subwoofer for a flown system
Figure 4.16.1 - Mounting of the front rigging end plates at the last subwoofer
1. Start by attaching the front rigging end plates at the front left and right of the subwoofer
(item 4 on the scope of delivery).
2. Attach each front rigging end plate using one cylinder screw, item 2 and one lock washer,
item 3 from the subwoofer scope of delivery.
3. Make sure to properly insert the lock washer as described in section 4.7!
4. Tighten both screws! (torque: 20 Nm)
WARNING
Figure 4.16.2 - Mounting the middle rigging end plates at the last subwoofer
5. Attach the middle rigging end plates at left and right of the subwoofer (item 5 on the scope
of delivery).
6. Attach each middle rigging end plate using one cylinder screw, item 2 and one lock
washer, item 3 from the subwoofer scope of delivery.
7. Make sure to properly insert the lock washer as described in section 4.7!
8. Tighten both screws! (torque: 20 Nm)
WARNING
2.
1.
6.
5.