2
INSTALLATION
The installation of this plant must be made in accordance with the local rules and
regulations on the place of installation
Before the plant is placed on its final place it should be inspected carefully for
transport damages. Possible damages should be reported to the forwarder.
How to assemble the plant
You should not fit any parts of the permanent buildings installations onto this
plant, as this inconveniences later service and repair work.
The plant is delivered on 2 Euro pallets and consists of a boiler, a fuel store and a
burner tube, which must be assembled before installation.
Fuel store can either be type 500/700 litre or type 800/1400 litre.
800/1400 litre fuel store must be sealed in the joint between lower and upper part.
Unscrew the 4 bolts in the joint and the clamp holding the pressure equalising pipe,
and then lift the upper parts app. 20mm up. Seal the joint with the included sealing
compound. Lift the upper part down again and mount all 48 bolts
1. The water cooled burner tube is fixed on the fuel store by means of bolts included.
The gasket for the flange is under the fuel store lid.
2. The fuel store with the now fitted burner tube is pushed into the pre made hole
with flange in the boiler.
3. Before you fixate the fuel store and burner tube to the boiler (with 2 bolts) you
must adjust the height of the fuel store by means of the 4 adjustment screws on
the legs, so that it is placed horizontal and in a 90 º angle to the boiler. It is
absolutely important, that the water cooled burner tube is horizontal as you
otherwise might experience air pockets in the system.
(By 800 and 1400 litre fuel store, mount wheels under fuel store and adjust
height.)
4. The water cooling of the burner tube can now be fitted as shown on
diagram 1.
or diagram 1.1, depending on plant layout.
All parts including fittings and
circulation pump are in the accessories box included.
(
Please note, that the
circulation pump is for circulation between boiler and burner tube only)
5. The combustion fan is fitted on the square stud on the side of the burner tube, no
gasket needed.
6. The hose for pressure equalising in the fuel store is fitted on opposite square stud
on burner tube
7. The draft regulator, needed by manual heating, is fixed on the top of the boiler in
the same side as the door hinges for the combustion room door. The chain is
connected to the lower air inlet on the boiler.
8. The plug for power to the boiler is pushed in and secured by a screw. The cable is
placed in the tray underneath the plug. Cable W7 is for the circulation pump.
9.
Only by 500/700 fuel store: If you want to use a fuel which is likely to build
bridges* in the fuel store you must fit the included chain and the stirrer wings
(according to demand). See enclosure 1 in Users manual (* wood chips,
sawdust, wood shavings and the like)