3
using the 4 holes in the back of the
enclosure.
STEP 5:
Insert the battery platform in
the bottom of the enclosure. The bat-
tery platform has cutouts so wires
can be routed under the battery as
needed.
STEP 6:
Mount any extra equipment that will reside inside the enclo-
sure. Equipment can be mounted to removable backplate or to a plate
mounted to the door rails.
STEP 7:
Install
the batteries in the
enclosure. If using
multiple batteries,
connect in parallel
for 12V output or
connect in series
for 24V output.
12V 200Ah bat-
tery configura-
tion is shown
here.
For 12V 100Ah
two batteries are
connected in par-
allel with Plus(+)
connected to Plus
(+) and Minus(-)
connected to Mi-
nus(-).
For 12V 200Ah
the 100Ah config-
uration is doubled
with separate bat-
tery connection
wires to controller.