background image

  

 

UPS-ST2424-UBNT 

UPSPro™ Backup 

Power System 

▫ 

Wireless Base Stations 
and Client Devices 

▫ 

Surveillance Cameras 

▫ 

Remote Sensors 

▫ 

UBNT Equipment 

▫ 

Microtik Equipment 

Congratulations! 

on your purchase of the UPSPro™ outdoor 

backup power system. Please take a moment to review this Qwik 
Install Guide before assembly or battery installation. 

DANGER! Avoid Powerlines!  

You Can Be Killed! 

When following the instructions in this guide take extreme care to avoid 
contact with overhead power lines, lights and power circuits. Contact 
with power lines, lights or power circuits may be fatal. We recommend 
to install no closer than 20 feet to any power lines. 

Safety: 

For your own protection, follow these safety rules. 

▫ 

Perform as many functions as possible on the ground 

▫ 

Do not attempt to install on a rainy, windy or snowy day or if 
there is ice or snow accumulation at the install site or if the 
site is wet. 

▫ 

Make sure there are no people, pets, etc. below when you are 
working on a roof or ladder.

 

Recommended Tools: 

Phillips Screwdriver, 13mm and 10mm 

Open End Wrench, 8mm nut driver, Flat Blade Screwdriver 

Please help preserve the environment and return 
used batteries to an authorized depot 

Summary of Contents for UPSPro

Page 1: ...ghts and power circuits Contact with power lines lights or power circuits may be fatal We recommend to install no closer than 20 feet to any power lines Safety For your own protection follow these safety rules Perform as many functions as possible on the ground Do not attempt to install on a rainy windy or snowy day or if there is ice or snow accumulation at the install site or if the site is wet ...

Page 2: ...rews provided STEP 3 Install hole plug in drain hole in bottom right corner of the en closure STEP 4 Mount the DIN rail to the door using screws provided Mount any extra equipment to the orange backplate and secure the backplate in the enclosure Note The DIN rail can also be mounted to the orange backplate if desired STEP 5 If pole mounting the enclosure assemble the pole mount kit to the back of ...

Page 3: ...le to Controller Be sure to observe proper connection polarity STEP 8 Connect a two conductor wire between the back green con nector on the controller to the back green connector on the 5 port switch Observe proper polarity Note There are two V and two GND connections on the controller and the switch You can use either con nection The FG connection is for frame ground or earth ground If your groun...

Page 4: ... connector into the controller When a fully charged battery is connected the Green LOA LED should light on controller and the LED s on the 5 port switch should power up Note The green connector on the controller will become unplugged due to vibration and the weight of the cables Be sure to add a zip tie or other method to hold the cables and relieve the cable weight from the connector STEP 12 If y...

Page 5: ...enclosure is vented thru the wire feedthrus and vari ous hole plugs in the bottom of the enclosure Don t make these airtight with silicon 4 BATTERY MAINTENANCE The batteries used in the UPSPro sys tems don t require any maintenance They should last up to 5 years in normal use 5 BATTERY OVERDISCHARGE We highly recommend hooking all equipment loads to the controller voltage output This output will d...

Page 6: ... augment the UPSPro systems The TPW 400 SPECIFICATIONS Subject to change without notice Power Rating 30W Reserve Power 30W Load 2 battery 20 hours 4 battery 40 hours Battery Voltage DC 24V Battery Capacity 2 battery 51Ah 4 battery 102Ah Battery Type Valve Regulated Sealed Lead Acid GEL Battery Life 5 Years Controller Type 24V Solar POE Charge Controller POE and secondary outputs regulated Max Sola...

Page 7: ...sit tyconpower com for more info Compatible Solar Panel Kits Tycon Power Systems Solar Panel kits come with High Performance solar panels side of pole mounts and out door rated connection cabling Solar panels have a 25 year output warranty Pole mounts and panels are designed for wind loads to 90MPH Solar Kits 6 Hours Peak Sun 3 Hours Peak Sun TPSK24 85W 20W continuous 10W continuous TPSK24 120W 30...

Page 8: ...workmanship defects This warranty does not cover the following Parts requiring replacement due to improper installation misuse poor site conditions faulty power etc Lightning or weather damage Physical damage to the external internal parts Products that have been opened altered or defaced Water damage for units that were not mounted according to user manual Usage other than in accordance with inst...

Reviews: